Computer Application in Textile and Apparel Manufacturing Sector: Bangladesh needs urgent & immediate improvement in productivity in its garment factories. One of the techniques to

Pitch Time in Industrial Engineering: Let us assume that a shirt has 1,000 sec of standard time. It has 50 operations which have been divided among 40 operators. An operator may be allotted one or more operations. Time allotted to individual operator is called Pitch Time. Here each operator on average is allotted 1000/40-25 seconds of work. This time (25
» Read moreBottleneck Processes and Bottleneck Time in Industrial Engineering: The highest time taken by an operator to complete her task compared to other operators is referred to as bottleneck time. The process or processes associated with bottleneck time are called bottleneck process. Bottlenecks reduce productivity. The figure given below shows three bottlenecks, two above UCL, and one below LCL. Thus bottlenecks
» Read moreWork Measurement in Apparel Manufacturing Sector: Work measurement is the technique designed to set up time required by a qualified worker to accomplish a task at a defined rate of working. This technique is used to determine standard time in readymade garment manufacturing industry. Productivity as a whole depends upon how quickly a job can be accomplished in unit time.
» Read more